Self-build home: Find a plot
Find potential plots.
Finding a suitable plot (or property for conversion) is one of the biggest challenges for self-builders as demand generally exceeds supply. It might involve:
- Advertising.
- Registering with estate agents, land agents and local authorities.
- Using online search sites such as PlotBrowser and Rightmove.
- Offering a finder’s fee to property professionals.
- Joining a self-build forum.
- Considering land or property owned by family members.
- Approaching owners of land designated for residential use in local development plans.
- Analysing aerial photography and large-scale maps which might reveal potential infill plots, such as; large back gardens, waste ground or brownfield sites.
- Poorly built, low-value properties that might be worth purchasing for their land value.
Be aware that there are a number of scams that attempt to exploit people looking for self-build plots. Always keep in mind the phrase ‘buyer beware’. If it sounds too good to be true, then it probably is.
Assess potential plots.
In considering different potential plots, it is important to assess:
- Compatibility with the requirements set out in the brief.
- The likelihood that planning permission will be granted, including possible objections from interested parties. Some sites are offered with outline planning permission, and without this, or detailed planning permission, the site may not be a developable plot. Proceeding with such a plot is taking a risk that the vendor did not consider worthwhile. However, plots with permission in place are likely to be more expensive.
- The date of any planning consent. Construction of a development must begin within three years of a planning approval, and reserve matters applications (applications giving details following an outline planning permission) must be made within three years of the outline approval.
- The planning history of the plot.
- Uses of adjoining land.
- Future developments planned in the area that might impact on the proposed plot.
- The connectivity of the location in terms of; transport links, access to schools, shops and other amenities.
- The exact legal boundaries of the plot.
- Ease of access onto the plot, both for construction vehicles and once the home is complete.
- Site orientation relative to the sun, views, prevailing wind and so on.
- Land topography, levels and flood risk.
- Availability or proximity of utilities. The cost of bringing utilities to a site will depend on the distance from existing connections and can be very expensive.
- Price in relation to the budget, including stamp duty land tax.
- Legal complexities, such as listed buildings, conservation areas, boundary disputes, party walls, easements, restrictive covenants, tree preservation orders and so on. See Technical due diligence for more information.
- The presence of protected species such as great crested newts or controlled species such as Japanese knotweed which can delay developments and incur significant costs.
- Obstructions such as old foundations which may need to be removed.
- Whether there is any contaminated land.
- The suitability of ground conditions for supporting a building and for landscaping.
- The possible layout of accommodation on the site.
- The likely value of the completed development.
Featured articles and news
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.